India
Maharashtra
Mumbai Municipal Corporation
Originally constructed in stone masonry, Tansa Dam was strengthened by Coyne's method. The Dam structure was anchored to the foundation rock by 2,400 high tensile prestressed cables (80 tonnes final stress).These were laid through 65 mm. diameter holes drilled in the body of the dam. These holes were then grouted. The total length of the cables was 73,000m.
Dia. of cable 65 mm.
Total length of cable 73,000m.
Final stress 80 tonnes.