USA
Colorado
City of Colorado Springs
10' diameter penstock
36" sleeve valves
Construction of energy dissipation structure at the Stanley Canyon Facility. Includes installation of 10' diameter penstock and manifold, installation of two 36" sleeve valves, 150,000 cy tunnel muck excavation, and miscellaneous site work.