Nepal
Nepal
National Hydro Electric Power Corporation
This project was completed one year ahead of schedule
The project is located over Trishuli river in Nepal.
Scope for work included:
a) Forebay Dam - Circular in shape with earthen embankments
b) Intake - Concrete structure
c) Steel penstocks 3 nos; 2.5 dia; 100m. long
d) Surface Power House with 3 units of 4.7 MW each
e) Tail Race Channel - about 60m. long
Excavation 1,53,000 cu.m.
Earth fill 2,00,000 cu.m.
Concrete 43,000 cu.m.
Reinforcement 10000 tonnes