India
Andhra Pradesh
I & CAD (Andhra Pradesh)
Investigation, Designs, Estimation and formation of Earthen Dam for Hiramandalam Reservoir to store a capacity of 19.05 TMC of water and Construction of Surplus arrangements,Construction of head sluice for link canal to discharging capacity of 4000 C/s and excavation of link canal to connect right main canal, construction of right head sluice for high level canal and excavation of high level canal for a lengthof 30 km
Capacity of Reservoir: 19.359 TMC
Length of Earth bund: 7.015 Km
Maximum Height of Earthbund: 42.74M
Spill way discharging capacity: 31,600 Cusecs
Height of Spillway: 33.60M