• Plus
  • Minus
Back

Kalwakurty Lift Irrigation Project

   
Details
Location:

India

State:

Telangana

Client:

I & CAD (Andhra Pradesh)

Highlights:

Static Head of each pump is  is 90 M  of 5 x 30 MW (30 MW is the largest Pump Capacity Installed  in Andhra Pradesh) 

Project Overview

Design, Supply, Execution of civil, Hydro Mechanical and Electro Mechanical works for (No. of pumps are 5 Nos x 30MW, Capacity of each pump is 22.66 cumecs, Type of pump is Francis turbine pump, Type of erection is vertical / Horizantal Vertical) and Hydro Mechanical works (D.T Gate size is 5.817m X 3.0 is 5 nos) on BOT basis as per the scope of work set forth in the bid documents and also operation and maintenance of the plant for five 3 years, after successful commissioning of the project

Technical Details:

Under Ground Tunnel - 388.50 Mts (Diameter 7.0 Mts, Horse Shoe)
Surge pool - 110M x 40M X 64.61M
Pump House - 72.60M X 18.60M X 69.0M
Delivery Mains - 1420 M length, Dia - 3.0 M of 14MM thick MS Pipes
Dimensions of Cistern - 36M X 28M X 8.0M

Back To Top