• Plus
  • Minus
Back

Tons Hydro Electric Project

   
Details
Location:

India

State:

Madhya Pradesh

Client:

Madhya Pradesh Electricity Board

Highlights:

3.562 km long tunnel of 10.8 mt dia 

Project Overview

This project is located near Rewa in the State of Madhya Pradesh. Scope of work includes construction of 10.3m. finished diameter, 3655m. long tunnel through weak shales in layers, requiring exterior supports and primary concrete along with excavation. The tunnel is a part of water conductor system for power generation and irrigation purposes.

Technical Details:

Open Excavation: 1,96,000 cu.m.
Tunnel Excavation: 3,30,000 cu.m.
Concrete: 47,000 cu.m.
Steel Supports 800 tonnes

Back To Top