Kiru Hydro Electic Project

   
Details
Location:

State:

Jammu & Kashmir

Client:

Chenab Valley Power Projects Pvt Ltd

Highlights:

Completed all major excavation work of the project such as Diversion Tunnel, Power House & Transformer Cavern and all Tunnels.

Achieved 40% concrete work progress of Gravity Dam and achieved 34% concreting work progress of Project till date

Project Overview

Kiru HE Project (624 MW), a run-of-river scheme is proposed on river Chenab in district Kishtwar ofUnion Territory of J&K and is about 42 kms at Pathernaki from Kishtwar. Project Proposed on river Chenab having project components on left bank envisages construction of concrete gravity Dam about deepest foundation across river Chenab, Power intake, Circular shaped pressure shafts, an undergroundPowerHouse with4units of 156MWeach with design discharge 586 cumecs and Tail Race Tunnels. Targets of annual energy generation is 2272.40 Million units with cost of generation per unit is Rs. 4.91.

Technical Details:
  • ADiversionTunnelof9mdia,700m long.
  • AConcreteGravityDamof135mhigh,193mlong(attop) with6nosof SpillwayBlocks.
  • PowerIntakeStructure(4no.)&PressureShafts(4no.)of5.5m dia,316m-322m long.
  • AnundergroundPowerHousecavernofsize182mx23.6m x51.20m.
  • ATransformerCavernofsize137m x17mx15m.
  • TailRace Tunnels(4no.)of7mdialengthsfrom165mto190m.
  • GIS&Potheadyardofsize140mx75m.