India
Maharashtra
Municipal Corporation of Greater Mumbai
Project Consists of Excavation of 6400m concrete lined tunnel by TBM, 4 nos of shaft excavation, Surface pipeline works,fixing of valves and electrical works
Powai-Ghatkoper: 4200m, 2.2m Dia.
Powai- Veravali: 2200m, 2.2m Dia.
Powai Shaft: 11m Dia. 65m Deep
Veravali Shaft: 7.3m Dia. 95m Deep
Ghatkoper High level Shaft: 7.3m Dia. 64m Deep
Ghatkoper Low level Shaft: 7.3m Dia. 63m Deep