USA
Oregon
Pueblo Board of Water Works
On site concrete and RCC production
Construction of new 18,000 CY RCC dam and new outlet tower. Dam is 43' high with a crest length of 565'. Dam is located directly downstream of an existing earthen dam. Includes 20,000 CY excavation, 825 CY reinforced concrete, breaching of existing dam, 42,000 CY excavation, clearing/grubbing, dewatering, rockfill and compacting backfill, furnishing and installing instrumentation, piezometers, joint meter, and drain piping.
Type of Dam: New RCC
Height: 43 feet; 13 m
Crest Length: 565 feet; 170 m
RCC Volume: 18,000 cy; 13,800 m3
Conventional Concrete: 825 cy; 630 m3